2016 – Major Works – Roof
Major works for the roof were carried out in 2016. The roof works also included the redecoration of the east flack wall (facing Brighton) which was not included in the front elevations renovations in 2013.
The cost of this work was £175,000. The works involved the overlaying of the existing asphalt with felt. The works also included upgrading of the of the insulation and the renewal of the lead flashing’s.
During the works the four small light wells that service the ventilation of the upper floor lavatories required further upgrading and this work is taking place in 2017.